Skip to content
Creating a New Data Sync Project
- Click the Switches menu.
- In the Navigation pane, click Switches.
- Depending on the amount of records you have within your database, the list may not readily populate. To populate the list, perform one of the following actions:
-
- Within the search box, type any portion of the record and then click the magnifying glass.
- Click the Show All
- Once the list populates, double-click the record to open the General – Switch window.
- Click the Data Sync drop down button and select add data sync. A new window opens labeled General – Import. Complete the following fields (required fields are marked with as asterisk (*)):
-
- Project Name* – type the project name.
- Switch Name* – click on the drop-down arrow to access a list and from the list; select the switch with which you wish to sync.
- Script Name* – click the drop-down arrow to access a list and from the list, select the script needed to perform the sync.
- Action* – click the drop-down arrow to access a list and from the list, select one of the sync types: Port, Number Plan, Number Plan Listing, Feature Key Maps, Configured Sets, Hunt Group Members, Switch Speed Dial, Switch Hunt Group Members.
- Auto Update – click the field to insert a checkmark in the box allowing auto-update.
- Description – type a project description.
- Comparison Type – click the drop-down arrow to access a list and from the list, select one of the following options:
- Compare All – compares everything in/out of the database.
- Ignore Not In Switch – ignores records in CAIRS that are not in the switch.
- At this point, you should save your progress, within the Actions ribbon group, click Save (save and stay) to continue working with the sync or Save & Close (save and exit) to return to the Switch